Control System Upgrade for Fly Ash Silos in Power Generation Plant

The Client: Power Generation Plant

THE CHALLENGE:

The client needed an upgrade on their current fly ash silos system.

 

 

LEC’S SOLUTION:

LEC designed a state-of-the-art upgraded system for the plant that included the conversion of large relay panels to PLC panels. The upgrade also included adding PC based HMI with data logging capabilities.